Showing posts with label house. Show all posts
Showing posts with label house. Show all posts

Tuesday, March 31, 2015

Don't Take a Counter Top For Granite!

Not this girl!  
Not after what we went through to get ours!

We had a friend recommend the company Bedrock Quartz to use as our fabricator and I cannot sing enough happy praises about this company!  
They had a large in stock selection to choose from IF...I had liked what they had.  

But I tend to have a vision of what I want in my mind and then it takes me forever to find it, if I am lucky.  More often than not, it doesn't even exist.  

So I started the hunt looking in granite yards all over the Salt Lake Valley and ended up choosing a slab at a place called Contempo.  Which I later found out is the most expensive place you can go to.  
I knew I wanted something with "movement" in it.  Not splotchie or spotted or that looked like throw up.  I fell in love with this slab called Crema Typhoon.  
Done!  
They had five slabs in stock and I only needed two!
Not so fast.

They were all spoken for, even though no one had put money down on them.  Because that makes sense to hold items for people when there is me standing there with cash in my hand ready to buy.

But they can order me some!  
Great!  
From Brazil! 
Not so great. 

They told me to wait two weeks.  
Which didn't seem like that big of a deal.

Two weeks passed and they told me to wait another week.
Then I called to check (three weeks without a counter OR placing an order anywhere with my cabinets already in)
and the counters were...
stuck in customs. 
Still in Brazil. 

I LOVED that Crema Typhoon.  I searched everywhere to see who else had it.
 No one did and I knew I needed to move on.  Who knew when it could come in and if it would even look like these slabs?

Lesson learned for any future build or just to pass along.  
Your counter tops should be the FIRST thing you look for.   I could have at least had slabs on reserve that would have been ready to go when the cabinets were in had I known!

Sunday, March 29, 2015

I Left You Hanging!

We have a fully completed kitchen, I promise!  I realized that I haven't blogged in a long time (does anyone really blog anymore?) but I should at least post pictures of our finished project!

We finally got all the cabinets in and the doors were being finished. 
 I then had the thrill of appliance shopping. Not my favorite thing to do so I made it easy on myself and hit Lowes.  We knew we wanted stainless steel and I knew for sure that I wanted a double oven, a quiet dishwasher (with our open floorplan that is a must!) and I went from there.

I ended up with a great deal on an LG suite.  I chose the French Door Refrigerator with Dual Ice Maker.  Don't let the sleek design fool you, this fridge can pack it in, it's HUGE!

I love the three separate drawers and the large deli drawer underneath.  The doors hold a TON and the shelves slide in and out to make room for different items. 

For the stove I went with the LG 30 inch 5 burner Double Oven with Gas Range.  I love that I can cook two things at once!  It was really the only way to get a double oven into this space and I've been really pleased with it!
We were really excited to finally have appliances back in the house and a semi working kitchen again! 


 We saved the old kitchen laminate counter to set on the top until the counter tops came in.
Doesn't it look classy?

Next up? 
THE COUNTER TOPS!
Also known as, the entire reason our project went over budget and seven weeks past our time frame. 

Friday, July 18, 2014

The Bathroom Wanted in on the Action

Why stop with just the kitchen?  
We should totally re-do the bathrooms too.  
Because nothing is better than not having a place to cook AND not having a place to bathe. 
 At the same time. 
 Our reasoning was this...look carefully at the bottom left corner of the shower.  The wall was coming off.  Nothing was there anymore.  After hearing from some other Centex homes owners, we were sure this was causing mold.  We ripped out the shower KNOWING we would find it everywhere. 
Guess what? 
We didn't.  

Ruh-roh.....
Yes, I just quoted Scooby Doo.  Because I felt as stupid as a cartoon dog by adding on to the already huge project/expense.
 So this is when you sweetly ask your husband what he thinks about putting a tile shower in.  He is cranky about the project and says "Whatever you want babe." 
Dan is pretty great like that.
 We went with Surface Art Venetian Reale Collection porcelain tile in Napoli.
 This was going to be used in our bathroom as well as the kids bathroom floor upstairs. 
 
 Then there is this moment where you joke with the tile guy that you hope he installs the right color.  And you inspect the box he opens - YUP!  
 
Right color!  
Except the box he showed you was the FLOOR tile (right color) and the WALL tile box was left unopened (not the right color.)
 And you have to break the news to him the next morning that it's wrong.  
 It was very brown....
He gets a little angry with you and you hope he doesn't key your car on the way out. 
It was nice enough, but I didn't really want two tile colors going on. 
 We had to completely reorder everything since matching up the color lots would be nearly impossible.  Add another eight days onto your project. 
Color #2 was chosen and this time I went with the same company and tile, but choose Antique Onyx.  
I love it even better than the first choice!

And you wait....
 In the meantime we expanded the shower and made it 6" bigger.  Doesn't sound like much but it is a huge difference!
 I realized last minute that I could add a niche!  There are SO many details that go into these projects that the simplest ones somehow get lost.  
I love having this now, so glad it occurred to me to put it in!
 The shower was opened up, sealed, Dan installed a new drain.
I picked out the new fixture at Lowes. It's the Kohler Linwood model and we love the rain shower feature.  

 

Wednesday, July 16, 2014

Goodbye Forever Honey Oak!

Can't say that I'll miss you!  
This was one expensive part of the project and honestly, I wouldn't recommend this company to anyone.  Even if they did a decent job on the railings, there are a few spots that I think could have been done better and their employees were RUDE. 
But it's done so here's what we did...no sense having the railings not match to the new floors, so we had them stained to match. 

It's a HUGE stinky mess but it was worth it since it really changed the look of the upstairs!
They matched the flooring color exactly so when we look down the hallway. two wood colors won't be glaring at me. 
 I kept the white posts because I love the look....but man, this cost me as much to restain as it did for us to do the posts instead of a solid wall when we built.  Maybe if we weren't in such a rush to get this all done and Dan didn't already have a to do list a mile long, we could have done this ourselves.  I've seen other bloggers tackle it, it just wasn't the project for us.
 Ta-da!  Isn't is gorgeous!?  Here are the new railings with the new carpet installed.  
 Speaking of which, we chose Mohawk Comfortably Classic patterned carpet in Natural Grain. 
 It has darker squares that tie everything together, it is very soft and VERY durable.  I really wanted a low pile textured carpet on the stairs that could take a beating from the kids and I'm so glad I went with this.  
Six months later it still looks beautiful without a single traffic pattern! 

Linking up to Ivy & Elephants
Coastal Charm 

Sunday, July 13, 2014

Are you Floored Yet?

Bwah ha haaa!  Get it?  Floored?  Bored?  
Oh, okay, nevermind....

I am going to start out by prefacing I am not a blogger who gets free stuff.  I guess you have to blog regularly about things for that to actually happen.  ;)  So any product or review I mention from here on out about our house remodel is the cold hard truth and it came straight from our wallet.  I wasn't paid a dime or given a thing for this mess I got us into!
 We got going on pulling up the carpet on a Saturday morning, we were expecting the new flooring to be delivered first thing Monday morning.  

We gave away and sold almost all of our furniture and moved the rest to the garage.  
We ordered California Classics Reserve Collection planks in Paso Robles. It is 100% hand carved, has 8 coats Valspar finish, (means it's TOUGH!) and has 4-6-8" random width. It's a gorgeous medium brown color.  I fell in love with it as soon as I saw it!
 I should add we ordered all of our flooring, tile and carpet from Chris at Wholesale Flooring Resource in Lindon.  He was SO great to work with, gave me some great ideas, but most importantly he was more than patient with me in the decision and install process.  The prices were great but his professionalism in handling our large order was more than impressive.  
 
 The unexpected problem we had with the floors was that our linoleum installer 10 years ago had a zeal about his work that left us thousands of nails that needed to be pulled out.  We started to hammer them down when we learned that doing so can cause your new floor to squeak.  So we called for back up!  

"Um, Dad, what are you doing today?"
 We also had to great friends, Jamie and Ryan, come by to help pull out nails that Sunday.  We were SO grateful for them!
 Flooring delivered!  It needed to sit for 3-4 days to acclimate to our home temperature. We also started to remove the old cheap blinds.
 The boys and my nephew Levi were awesome helpers. 
 Island out! 
 Cabinets out!
 Baseboards out!
 Trashy side yard, the demo was actually pretty fun.  I removed every single inch of baseboard and tack strips in the house.  
What a project!!
 Dan's brothers came by with their trailer and helped us load it all to take to the dump.
 We had fun watching these Eagle Scouts whip up knots to tie things down.  They had this loaded up so fast!
Meanwhile, the flooring guys came back to install and the wood was not ready.  WHAT?  They have these measuring tools that tells them when they can install and I guess the winter air here made it take FOREVER to get going.  So they had to unpack all the flooring while we waited an additional TWO WEEKS for it to be ready. 

If you don't wait for the floors to acclimate, horrible things like this can happen...
I had the option of giving the guys the go ahead a few days prior, but I asked them "When would you install it in your OWN home?"  They told me to wait.  
So far we've had zero problems with the flooring as far as install goes.  
Sometimes it's worth it to be patient. 
Which is fine but man we were getting sick of microwaving our dinner in the garage and eating out!  
And it was only week two!

Thursday, July 10, 2014

Gutting the Kitchen

In November,  because apparently I thrive off of chaos and I am stupid, we all moved downstairs.
Walking on plywood in the winter isn't that cozy.
 
 Torn out pantry.  Good job boys!
I sold all of the appliances...we got about $800 for everything so that was awesome.

 Packing up the crap...
 And starting to remove the flooring.